工程量计算书模板

发布时间:2023-06-04 作者:admin 来源:文学

工程量计算书模板

工程量计算书模板

百川资讯网-plt格式用什么软件打开

2023年2月16日发(作者:装饰合同)

编制人:

**人:**

编制日期:

工程量计算表

共29页第1页

序号

分部分项工程

名称

部位与规

计算式计算结果

一土石方工程

1人工挖土方底部面积m³(56.24+0.0)×(14.64+0.6)1929.464

顶部面积m³(56.84+2.05)×(15.24+2.05)1018.208

总挖方量m³1/3×2.05×

(866.242+1018.208+

1018.208242.866

1929.464

2平整场地10m

³

(56.24+4)×(12.24+4)97.830

二基础工程

1基础垫层m³[(2.6+1.6)×1.72+(3.5+2.6+5+3.3+0.8)×(3.9

+2.7+1.6)-(2.7-0.8)×0.6+(3.7+1.6)×1.8+(3

.3+3+1.9+3.2+2.6+3.6+3.6+2.7+3.3+3.5+2.6+5

+3.3+0.8)×(2.7+1.8+2.7+3.9+1.6)-(5.1-1.6+

15.1+8.3)×1.5+(1.8+1.5+6)×(3.6+3.6+3.3+3

.4+4.2+3.7+3.6+4+3+4+3.7+0.6+1.6)+(3.3+3.4

+4.2+3.7+3.6+4+3+4+3.7+0.6)×7.8+7.29×(1.

8+2.7+1.8+6+7.8+1.6)]×0.1

154.458

2筏板基础m³[2.6×1.72+(3.5+2.6+5+3.3+3)×

(2.7+1.8+2.7+3.9)+3.7×1.8-2.7×0.6+

(1.9+3.2+2.6+3.6+3.6+2.7+3.3+3.5+2.6+5+3.

3)×(2.7+1.8+2.7+3.9-1.5)+2.6×1.72×2+

(3.3+3.6+3.6+3.4+4.2+3.7+3.6+4+3+4+3.7+0.

6)×(6+1.5+1.8)+

(3.4+4.2+3.7+3.6+4+3+4+3.7+0.6)×7.8+

(1.8+2.7+1.8+6+7.8)×7.29]×0.6

773.523

三砌筑工程

1地下室填充墙m³152.930

地下室门

M10201×2×3162

GC06050.65×0.5×123.9

GC08050.8×0.5×62.4

工程量计算表

共29页第2页

序号

分部分项工程

名称

部位与规

计算式计算结果

GC09050.9×0.5×41.8

GC12051.2×0.5×21.2

GC15051.5×0.5×53.75

GC18051.8×0.5×10.9

240mm填

充墙

m³(56-6-0.48×2-0.4×13-0.5+14.4-1.5-0.48×

2-0.4-0.3+1.22+11-0.3×2-0.4×2+6.6-0.48-0

.4-0.3)×0.24×1.4+

(0.3+7.5-0.3+18.1-0.6×3+38.8-4×0.6-0.3+

7.2-0.3-0.12)×0.24×4.3

92.609

190mm填

充墙

m³(56-6-0.48×2-0.4×13-0.5+14.4-1.5-1.8-2.

7-0.1-0.4-0.48+6.6-0.48-0.4-0.3)

×0.19×0.63

6.725

200mm填

充墙

m³(3.9-1-0.32+3.3-0.32+2.3-1-0.15+5.08×6+3

.67×6+3.9-0.12-1-0.2+2.7-0.05-1)

×0.2×1.92+

(3.67+10.5-1-0.1+2.1-1-0.2+32.5-0.2-0.12)

×3.97×0.2

61.35

100mm填

充墙

m³(2.55+3.68+4.25×9+2.78+3.78+1.6+1.5+2.3+

2.8+2.48+4)×0.1×1.92

12.618

合计92.609+6.725+61.35+12.618-75.95×0.24-2.14

4

152.930

2一层填充墙m³110.602

一层门窗㎡

FDM10211×2.1×612.6

FM丙

1118

1.1×1.8×35.94

FM丙

0618

0.6×1.8×33.24

FM乙

1021

1×2.1×36.3

LM18421.8×2.354.23

工程量计算表

共29页第3页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

LM24242.4×2.35×528.2

M07210.7×2.1×1116.17

M09210.8×2.1×1728.56

M18221.8×2.2×311.88

C09150.9×1.45×67.83

C10151×1.451.45

C12151.2×1.45×23.48

C13151.3×1.451.885

C15151.5×1.45×1123.925

C15191.5×1.85×38.325

C18151.8×1.452.61

C18191.8×1.85×619.98

190mm

填充墙

m³(56.24-0.12×2-0.48-0.4×12-3×2-0.5×3-0

.48-0.6+56.24-0.12×2-0.8-0.48-0.4×12-0.6

×2+14.64×2-0.12×4-0.48×3-0.4×2-0.3×3

)×0.19×2.28

50.476

200mm

填充墙

m³(2.42+6.02×6+2.92+4+5.52×3+9.6+4.3+3.67

×2+2.8+2.62+3.02+1.6+3.67+3.42×3+2.9+11.

24+9.4+4.3×3+0.8+4.9+8.12+5.17+6.5+4.32×

3+4.3+3.3+4.3×3)×0.2×2.28

92.395

100mm

填充墙

m³[2.7-0.1+1.9-0.1+2.3-0.1+1.8-0.1+2.6-0.2+1

.75-0.2+1.8-0.2+2.4-0.1+2.6-0.2+(1.75-0.2)

×2+(1.8-0.1)

×2+4.9-0.2+2.6-0.2+2.7-0.1+1.9-0.1+2.3-0.

1+1.8-0.1)]×0.1×2.28

9.223

合计9.223+50.476+92.395-186.605×0.2-4.171110.602

3二层填充墙m³118.386

二层门

工程量计算表

共29页第4页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

FDM102

1

1×2.1×612.6

FM丙

0618

0.6×1.8×33.24

FM丙

1118

1.1×1.8×35.94

LM24242.4×2.35×528.2

LM18241.8×2.35×14.23

M07210.7×2.1×1116.17

M09210.8×2.1×1728.56

C09150.9×1.45×67.83

C10151×1.45×11.45

C12151.2×1.45×23.48

C13151.3×1.45×11.885

C15151.5×1.45×1123.925

C15191.5×1.85×38.325

C18151.8×1.45×12.61

C18191.8×1.85×619.98

C12111.2×1.05×33.78

200mm

填充墙

m³(2042+6.02×6+2.92×4×5.52×3+9.6+4.3+3.

67×2+2.8+2.62+3.02+1.6+3.67+3.42×3+2.9+1

1.24+9.4+4.3×3+0.8+4.9+8.12+5.17+6.5+4.32

×3+4.3+3.3+4.3×3)×0.2×2.28

92.395

190mm

填充墙

m³(56.24-0.12×2-0.48-0.4×12-3×2-0.5×3-0

.48-0.6+56.24-0.12×2-0.8-0.48-0.4×12-0.6

×2+14.64×2-0.12×4-0.48×3-0.4×2-0.3×3

)×0.19×2.28

50.476

100mmm³[2.7-0.1+1.9-0.1+2.3-0.1+1.8-0.1+2.6-0.2+19.223

填充墙.75-0.2+1.8-0.2+2.4-0.1+2.6-0.2+(1.75-0.2)

×2+(1.8-0.1)

×2+4.9-0.2+2.6-0.2+2.7-0.1+1.9-0.1+2.3-0.

1+1.8-0.1]×0.1×2.28

工程量计算表

共29页第5页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

合计9.223+50.476+92.395-

(12.6+3.24+5.94+28.2+4.23+16.17+28.56)

×0.2-

(7.83+1.45+3.48+1.885+23.925+8.325+2.61+1

9.98+3.78)×0.19

118.386

4三~五层填充墙m³342.561

三~五

层门窗

FDM102

1

1×2.1×6×337.8

FM丙

0618

0.6×1.8×3×39.72

FM丙

1118

1.1×1.8×3×317.82

LM18241.8×2.35×1×312.69

LM24242.4×2.35×5×384.6

M07210.7×2.1×11×348.51

M09210.8×2.1×17×385.68

C09150.9×1.5×6×323.49

C10151×1.45×1×34.35

C12151.2×1.45×5×326.1

C13151.3×1.45×1×35.655

C15151.5×1.45×11×371.775

C15191.5×1.85×3×324.975

C18151.8×1.45×1×37.83

C18191.8×1.85×6×359.94

200mm

填充墙

m³(2.4+2+6.02×6+2.92+4+5.52×3+9.6+4.3+3.6

7×2+2.8+2.62+3.02+1.6+3.67+3.42×3+2.9+11

.24+9.4+4.3×3+0.8+4.9+8.12+5.17+6.5+4.32

277.185

×3+4.3+3.3+4.3×3)×0.2×2.28×3

工程量计算表

共29页第6页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

190mm

填充墙

m³(56.24-0.12×2-0.48-0.4×12-3×2-0.5×3-0

.48-0.6+56.24-0.12×2-0.8-0.48-0.4×12-0.6

×2+14.64×2-0.12×4-0.48×3-0.4×2-0.3×3

)×0.19×2.28×3

151.428

100mm

填充墙

m³[2.7-0.1+1.9-0.1+2.3-0.1+1.8-0.1+2.6-0.2+1

.75-0.2+1.8-0.2=2.4-0.1+2.6-0.2+

(1.75-0.2)×2+(1.8-0.1)×2+4.9-0.2+2.6-0.

2+2.7-0.1+1.9-0.1+2.3-0.1+1.8-0.1]×0.1×2

.28×3

27.669

合计277.185+151.428+27.669-

(37.8+9.72+17.82+12.69+84.6+48.51+85.68)

×0.2-(23.49+4.35+26.1+5.655+71.775+24.975

+7.83+59.94)×0.19-11.775

342.561

5六层填充墙m³114.318

六层门

FDM102

1

1×2.1×612.6

FM丙

0618

0.6×1.8×33.24

FM丙

1118

1.1×1.8×35.94

LM18241.8×2.35×14.23

LM24242.4×2.35×528.2

M07210.7×2.1×1116.17

M09210.8×2.1×1728.56

C15191.5×1.85×38.325

C09140.9×1.35×67.29

C10141×1.35×11.35

C12141.2×1.35×23.24

C12241.2×2.4×38.64

C13141.3×1.35×11.755

C15141.5×1.35×1122.275

工程量计算表

共29页第7页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

C18141.8×1.35×12.43

C18181.8×1.75×618.9

200mm

填充墙

m³(2.42+6.02×6+2.92+4+5.52×3+9.6+4.3+3.67

×2+2.8+2.62+3.02+1.6+3.67+3.42×3+2.9+11.

24+9.4+4.3×3+0.8+4.9+8.12+5.17+6.5+4.32×

3+4.3+3.3+4.3×3)×0.2×2.28

92.395

190mm

填充墙

m³(56.24-0.12×2-0.48-0.4×12-3×2-0.5×3-0

.48-0.6+56.24-0.12×2-0.8-0.48-0.4×12-0.6

×2+14.64×2-0.12×4-0.48×3-0.4×2-0.3×3

)×0.19×2.28

50.476

100mm

填充墙

m³[2.7-0.1+1.9-0.1+1.8-0.1+2.6-0.2+1.75-0.2+

1.8-0.2+2.4-0.1+2.6-0.2+(1.75-0.2)×2+

(1.8-0.1)

×2+4.9-0.2+2.6-0.2+2.6-0.2+2.7-0.1+1.9-0.

1+2.3-0.1+1.8-0.1]0.1×2.28

9.223

合计92.395+50.476+9.223-

(12.6+3.24+5.94+4.23+28.2+16.17+28.56)

×0.2-

(8.325+7.29+1.35+3.24+8.64+1.775+22.275+2

.43+18.9)×0.19-3.885

114.318

6阁楼层填充墙m³54.321

阁楼层

门窗

C15121.5×2.1×39.45

C24212.42.1×630.24

200mm

填充墙

m³{[(1.8+2.7+1.8-0.28-0.4-0.1)×2+

(11-0.1-0.4-0.6-0.1)×2+(4.5-0.1-0.1)

×2]×2+

(10.9-0.3-0.4×2+10.9-0.2×2-0.4×2+4.32+

(4.42-0.1-0.8)×2+4.42-0.3-0.1}×2.8×0.2

63.482

合计63.482-(9.45+30.24)×0.2-1.22354.321

工程量计算表

共29页第8页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

四混凝土工程

1筏板基础m³[2.6×1.72+(3.5+2.6+5+3.3+3)

×(2.7+1.8+2.7+3.9)+3.7×1.8-2.7×0.6+

(1.9+3.2+2.6+3.6+3.6+2.7+3.3+3.5+2.6+5+3.

3)×(2.7+1.8+2.7+3.9-1.5)+2.6×1.72×2+

(3.6+3.6+3.3+3.4+4.2+3.7+3.6+4+3+4+3.7+0.

6)

×(6+1.5+1.8)+(3.4+4.2+3.7+3.6+4+3+4+3.7+0

.6)×7.8+(1.8+2.7+1.8+6+7.8)×7.29]×0.6

773.523

2柱m³273.883

KZ10.6×0.6×[4.6+0.05)×5+(0.6×0.2+0.4×0.2

)×(2.8+4.6)×6+(0.6×0.2+0.4×0.2)×(16.7

5-0.05-0.12×6)

20.446

KZ20.3×0.8×(16.75+4.6-0.09×7)×629.837

KZ30.4×0.4×(21.754+4.6-0.09×7)×1769.969

KZ40.3×1.2×(16.75+4.6-0.12×7)×214.767

KZ50.4×0.4×(16.75+4.6-0.09××7)×619.891

KZ60.3×0.6×(21.754+4.6-0.12×7)×29.185

KZ70.6×0.6×(4.6-0.05)×16+(0.6×0.2+0.2×0.

4)×(16.75+0.05-0.3×7)×16

56.76

KZ80.3×0.55×(16.75+4.6-0.09×7)×413.675

KZ9[0.6×0.6×(4.6-0.05)+0.4×0.4×(16.75+0.0

5-0.13×6)]×2

8.402

KZ10[0.5×0.5×(4.6-0.05)+(0.5×0.2+0.2×0.3)

×(16.75+0.05-0.13×6)]×3

11.102

KZ110.3×1×(21.754+4.6-0.13×7)×17.633

KZ120.3×1.1×(16.75+4.6-0.3×7)×16.353

KZ130.3×0.75×(16.75+4.6-0.09×7)×14.662

KZ140.3×0.4×(21.754-16.75)×21.201

合计273.883

工程量计算表

共29页第9页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

3板m³750.717

一层板m³262.579

LB1m³[(11+0.2)×(4.5+0.1)+(3.3+0.095)×

(3.6+0.095)+3.6×6+3.6×(4.5+3.9)

+3.3×(4.5+7..2)+7.6×4.5+7.3×6.3+3.7×1.

75+3.6×4.25+3.3×4.25+11×4.5]×0.12

38.401

LB2m³[(3.9+0.095)(3.3+0.095)+(4.5+0.095)×

(3.7+0.19)+2.7×(4.3+0.095)+(3.9+0.095)

×(3.3+0.095)+4.5×3.7+2.7×

(4.3+0.095)]×0.12

10.246

LB3m³[1.8×(4.3+0.095)+1.8×2.9]×0.091.182

LB4m³[5×(3.9+0.095)+2.7×4]×2×0.138.002

LB5m³[3.5×(6.6+0.095)+3.6×(7.2+0.095)+3.5×

(6.6+0.095)]×0.13

9.507

LB6m³[(2.3×1.75+2.4×1.75+(1.9+0.095)×

(3.3+0.095)]×0.09

1.350

LB7m³[(3.6+0.095)×(6.9+0.095)+14.5×

(6.6+0.095)

+7.3×6+7.8×11+(12.3+0.095)×7.89+37.49×

193.891

(7.8+0.095)]×0.3

二层板m³72.649

LB1m³[1.8×1.4+11×4.5+(3.3+0.095)×

(4.25+0.095)

+3.6×5+3.6×(4.5+3.9)+4.5×10.9+(3.6+0.09

5)×(4.25+0.095)+(3.3+0.095)×(4.25+0.095)

+7.3×8.05+4.5×7]×0.12

34.259

LB2m³[(3.3+0.095)×(3.9+0.095)+(4.3+0.095)

×2.7+(4.5+0.095)×(3.7+0.095)]×2×0.12

10.288

工程量计算表

共29页第10页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

LB3m³1.8×(4.3+0.095)×2×0.091.424

LB4m³[5×(3.9+0.095)+2.7×4]×2×0.138.002

LB5m³[11×(1.8+0.095)+10.9×(1.8+0.095)

+0.65×1.2+1.75×2.3+11×

(1.8+0.095)]×0.09

6.044

LB6m³[3.5×(6.4+0.095)+1.2×2.95+3.6×7.2+3.5×

(6.6+0.095)]×0.13

9.831

LB7m³3.2×(7.2+0.095)×0.122.801

三~五

层板

m³231.26

LB1m³[11×4.5+(3.3+0.095)×(4.25+0.095)+3.6×6+

(1.9+0.095)×(3.3+0.095)

+3.6×8.4+4.5×10.9+3.6×(4.25+0.095)+3.3

×(4.25+0.095)+7.3×8.05+4.5×7]×3×0.12

127.122

LB2m³[(3.3+0.095)×(3.9+0.095)+2.7×

(4.3+0.095)]×2×3×0.12

18.309

LB3m³1.8×(4.3+0.095)×2×3×0.094.272

LB4m³[5×(3.9+0.095)+2.7×4]×2×3×0.1324.005

LB5m³[11×(1.8+0.095)

+2.3×3.55+0.65×1.2+10.9×(1.8+0.095)

+11×(1.8+0.095)]×3×0.09

19.248

LB6m³[3.5×(6.6+0.095)+1.2×2.95+3.6×

(7.2+0.095)+3.5×(6.6+0.095)]×3×0.13

29.900

LB7m³3.2×(7.2+0.095)×3×0.122.801

工程量计算表

共29页第11页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

六层板m³85.346

LB1m³[4.5×11+(3.3+0.095)×(4.25+0.095)

+3.6×6+3.6×(4.5+3.9)+4.5×10.9+

(3.6+0.095)×(4.25+0.095)+(3.3+0.095)

×(4.25+0.095)+7.3×8.05+7×4.5]×0.12

34.345

LB2m³[(3.3+0.095)×(3.9+0.095)+2.7×

(4.3+0.095)]×2×0.12

6.103

LB3m³1.8×(4.3+0.095)×2×0.091.424

LB4m³[5×(3.9+0.095)+2.7×4]×2×0.138.002

LB5m³[11×(1.8+0.095)×2+10.9×(1.8+0.095)

+2.3×1.75]×0.09

22.704

LB6m³[3.5×(6.6+0.095)+3.6×(7.2+0.095)+3.5×

(6.6+0.095)+1.2×2.95]×0.13

10.05

LB7m³3.2×(7.2+0.095)×0.122.801

阁楼层

m³74.011

LB1m³(3×4.5+3.4×4.5+3×4.5)×0.125.076

WB1m³[4×4.5×2+(1.8+0.095)

×11+2.6×5.1+3.7×4.2+1.9×2.8+3.2×13.5+

7.6×4.5+4.2×4.5+3.3×4.5+4.5×4+11×1.8+

4.5×4]×0.12

30.950

WB2m³[(3.3+0.095)×(3.9+0.095)+4.5×(4.3+0.095)

+3.7×4.5]×2×0.12

11.998

工程量计算表

共29页第12页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

WB3m³(5×3.9+4×2.7)×2×0.137.878

WB4m³3.6×6.47×2×0.136.056

WB5m³3.6×6.3×3×0.128.165

屋顶板m³24.872

WB1m³(4×6.3×4+3.3×6.3+4.2×6.3)×0.1217.766

WB2m³(3×6.3+3.4×6.3+3×6.3)×0.127.106

4梁m³

一层梁m³67.461

KL10.2×1.4×(3.32+2.4+1.7)2.078

KL20.4×0.7×(5.4+7.2+4+3.9)5.74

KL30.2×0.4×3.320.266

KL50.2×0.4×(7.2+5.4+3.9+6+0.9)1.872

KL60.2×0.4×(6+0.9)0.552

KL70.2×0.4×5.70.456

KL80.2×0.24×3.650.175

KL90.4×0.7×(7.2+5.4+5.7+1.8)5.628

KL100.2×0.4×3.650.292

KL110.2×0.8×(5.7+1.8)1.2

KL120.2×0.6×3.650.438

KL130.4×0.7×(7.2+5.4+5.7+1.8)5.628

KL140.2×0.4×30.24

KL150.2×0.4×(6.6+1.22)0.626

KL170.2×0.4×6.60.528

KL180.2×0.4×3.90.312

工程量计算表

共29页第13页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL190.2×0.4×2.70.216

KL200.2×0.4×(5.9+2.9+3.15)0.956

KL210.2×0.4×3.650.292

KL220.2×0.6×(3.9+0.3)0.504

KL240.2×0.4×(6+1.22)0.578

KL250.2×0.4×(6+1.22+3.9)0.890

KL260.2×0.4×3.30.264

KL270.2×0.4×(3.3+3.9)0.576

KL290.4×0.7×(3.1+6.69)2.741

KL300.2×1.4×(3.1+3)1.708

KL310.2×1.4×(3+2.7+2.8+3.6+3)4.228

KL320.2×0.4×(3.1+3.4+2.4+3.4)+0.2×1.4×(3.4

+2.4)

2.608

KL330.2×1.4×(3+3.4+2.1+3.9+1.2)3.808

KL340.2×0.4×3.10.248

KL350.2×0.4×(3+2.7+2.8+3.6)0.968

KL360.2×0.4×3.10.248

KL370.2×0.4×(3.6+2.6+3.6+3.1)1.032

KL380.2×0.4×(3.1+3)0.488

KL390.2×0.4×(3.1+3.4+2.4+3.4)0.984

KL400.2×0.4×2.70.216

KL410.2×0.4×30.24

KL420.2×0.4×3.70.296

KL430.2×0.4×(1.3+1.2)0.2

KL440.2×0.4×(2.7+0.6)0.264

KL450.2×0.4×2.70.216

KL460.2×0.4×(1.3+2.6+2+3+3)1.176

KL470.2×0.4×(1.3+2.6+2+3+3)0.952

KL480.2×0.4×(2+2+2)0.48

KL490.2×0.4×(2.7+4.4+2+2.9+2.7)1.176

工程量计算表

共29页第14页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

L10.2×0.3×(1.6+1.6)0.192

L20.2×0.3×(1.55+1.55)0.186

L30.2×0.3×(2.4+2.4+2.4)0.438

WKL10.4×0.7×(5.7+5.4+7.2)5.124

WKL20.4×0.7×(6.7+6.4+7.1+7.29)7.697

WKL30.2×0.4×30.24

WKL40.2×0.4×2.10.1688

XL10.2×0.4×0.60.048

二层梁m³32.441

KL10.2×.04×(3.3+3.9)0.576

KL20.2×0.8×3.90.624

KL30.2×0.4×3.30.264

KL40.2×0.4×(1.2+2.1+1.2)0.360

KL50.2×0.4×(6+0.9+3.9+1.2)0.960

KL60.2×0.5×(6+0.9)0.690

KL70.2×0.6×(3.9+1.2)0.612

KL80.2×0.4×3.650.292

KL90.2×0.4×(3.9+1.2)0.408

KL100.2×0.4×3.650.292

KL110.2×0.8×(5.7+1.15)1.096

KL120.2×0.6×3.650.438

KL130.2×0.6×(5.7+1.2)0.828

KL140.2×0.4×3.650.292

KL150.2×0.6×3.90.468

KL160.2×0.5×(6.6+1.22)0.782

KL170.2×0.4×(6.6+1.22+3.9)0.938

KL180.2×0.4×6.60.528

KL190.2×0.4×3.90.312

工程量计算表

共29页第15页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL200.2×0.4×2.70.216

KL210.2×0.5×(3+3.85)0.685

KL220.2×0.4×3.650.292

KL230.2×0.6×(4.5+1.2)0.684

KL240.2×0.4×3.650.292

KL250.2×0.5×(6+1.22)0.722

KL260.2×0.4×(6+1.22+3.9)0.890

KL270.2×0.4×(1.2+3.9+2.1)0.576

KL280.2×0.4×3.30.264

KL290.2×0.8×3.90.624

KL300.2×0.4×(3.3+2.1)0.432

KL310.2×0.4×(7.1+6.4)1.080

KL320.2×0.4×(3.1+3)0.488

KL330.2×0.4×(3+2.7+2.8+3.6)0.968

KL340.2×0.4×(3.4+6.4)0.784

KL350.2×0.4×(3.4+2.4+3.4)0.736

KL360.2×0.4×30.240

KL370.2×0.4×(3+2.7+2.8+3.6)0.968

KL380.2×0.4×3.10.248

KL390.2×0.4×(3.4+2.4+3.4+3.7)1.032

KL400.2×0.4×(3.1+3)0.488

KL410.2×0.4×(3.7+3.4+2.4+3.4)1.032

KL420.2×0.4×2.70.216

KL430.2×0.4×30.240

KL440.2×0.4×2.70.216

KL450.2×0.4×1.20.096

KL460.2×0.4×(2.7+0.6)0.264

KL470.2×0.4×2.70.216

KL480.2×0.4×(4.4+2.7)0.568

工程量计算表

共29页第16页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL490.2×0.4×(2.7+2.9)0.448

KL500.2×0.4×(3+3)0.480

KL510.2×0.4×(2.6+1.3)0.312

KL520.2×0.4×(2.9+2.7)0.448

KL530.2×0.4×(4.4+2.7)0.568

WKL10.2×0.4×30.240

WKL20.2×0.4×2.10.168

WKL30.2×0.4×2×30.480

L10.2×0.3×1.2×20.144

L20.2×0.3×1.15×20.138

L30.2×0.4×(3.6+2.8+2.7)0.728

L40.2×0.3×2×30.360

L50.2×0.4×2×30.480

L60.2×0.4×0.60.048

XL10.2×0.4×3.10.248

三~五

层梁

m³91.965

KL10.2×0.4×(3.3+3.9)0.576

KL20.2×0.8×3.90.624

KL30.2×0.4×3.30.264

KL40.2×0.4×(2.1+3.9+1.2)0.576

KL50.2×0.5×(6+3.9)0.990

KL60.2×0.5×60.600

KL70.2×0.6×3.90.468

KL80.2×0.4×3.650.292

KL90.2×0.4×(3.9+0.6)0.360

KL100.2×0.4×3.650.292

KL110.2×0.8×(5.7+1.2)1.104

KL120.2×0.6×3.650.438

工程量计算表

共29页第17页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL130.2×0.6×(5.7+1.2)0.828

KL140.2×0.4×3.650.292

KL150.2×0.6×3.90.468

KL160.2×0.5×6.60.660

KL170.2×0.5×(6.6+3.9)1.050

KL180.2×0.4×6.60.528

KL190.2×0.4×3.90.312

KL200.2×0.4×2.70.216

KL210.2×0.5×(3+3.85)0.685

KL220.2×0.4×3.650.292

KL230.2×0.6×(4.5+1.2)0.684

KL240.2×0.6×3.90.468

KL250.2×0.5×60.600

KL260.2×0.4×(2.1+3.9+1.2)0.576

KL270.2×0.4×3.30.264

KL280.2×0.8×3.90.624

KL290.2×0.4×3.90.312

KL300.2×0.4×(10.4+3.1)1.080

KL310.2×0.4×(3+3.1)0.488

KL320.2×0.4×(2.7+2.8+3.6+3)0.968

KL330.2×0.4×(3.1+10.4)1.080

KL340.2×0.4×(3.4+2.4+3.4)1.472

KL350.2×0.4×30.240

KL360.2×0.4×(3+2.7+2.8+3.6)0.968

KL370.2×0.4×3.10.248

KL380.2×0.4×(3.4+2.4+3.4+3.7)1.032

KL390.2×0.4×(3.1+3)0.488

KL400.2×0.4×(3.7+3.4+2.4+3.4)1.032

KL410.2×0.4×2.70.216

工程量计算表

共29页第18页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL420.2×0.4×30.240

KL430.2×0.4×2.70.216

KL440.2×0.4×3.10.248

KL450.2×0.4×(2.7+0.6)0.264

KL460.2×0.4×2.70.216

KL470.2×0.4×(4.4+2.7)0.568

KL480.2×0.4×(2.7+2.9)0.448

KL490.2×0.4×30.240

KL500.2×0.4×2.60.208

KL510.2×0.4×(2.9+2.7)0.448

KL520.2×0.4×2.50.200

WKL10.2×0.4×30.240

WKL20.2×0.4×2.10.168

L10.2×0.3×1.2×20.144

L20.2×0.3×1.15×20.138

L30.2×0.4×(2.7+2.8+3.6)0.728

L40.2×0.3×2×30.360

L50.2×0.4×2×30.480

L60.2×0.4×0.60.048

XL10.2×0.4×3.10.248

六层梁m³34.536

KL10.2×0.4×(3.3+3.9)×21.152

KL20.2×0.8×3.90.624

KL30.2×0.4×3.30.264

KL40.2×0.4×(2.1+3.9+1.2)0.576

KL50.2×0.5×(6+3.9)×32.970

KL60.2×0.5×6×21.200

KL70.2×0.6×3.9×20.936

工程量计算表

共29页第19页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL80.2×0.4×3.65×20.584

KL90.2×0.4×(4.5+1.2)0.456

KL100.2×0.4×3.650.292

KL110.2×0.8×(5.7+1.15)1.096

KL120.2×0.6×3.650.438

KL130.2×0.6×(5.7+1.2)0.828

KL140.2×0.6×3.90.468

KL150.2×0.5×6.60.660

KL160.2×0.5×6.60.660

KL170.2×0.4×6.60.528

KL180.2×0.4×3.90.312

KL190.2×0.4×2.70.216

KL200.2×0.5×(4.5+1.2)0.570

KL210.2×0.4×3.650.292

KL220.2×0.6×(4.5+1.2)0.684

KL230.2×0.4×(1.2+3.9+2.1)0.576

KL240.2×0.4×3.30.264

KL250.2×0.8×3.90.624

KL260.2×0.4×(10.4+3.1)1.080

KL270.2×0.4×(3.1+3)0.488

KL280.2×0.4×(3+2.7+2.8+3.6)0.968

KL290.2×0.4×(3.1+10.4)1.080

KL300.2×0.4×(3.4+2.4+3.4)×21.472

KL310.2×0.4×30.240

KL320.2×0.4×(3+2.7+2.8+3.6)0.968

KL330.2×0.4×(3.4+2.4+3.4+3.7)1.032

KL340.2×0.4×(3+3.1)0.488

KL350.2×0.4×(3.4+2.4+3.4+3.7)1.032

KL360.2×0.4×2.70.216

KL370.2×0.4×30.240

KL380.2×0.4×2.70.216

工程量计算表

共29页第20页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL390.2×0.4×3.10.248

KL400.2×0.4×(2.7+0.6)0.264

KL410.2×0.4×2.70.216

KL420.2×0.4×(4.4+2.7)0.568

KL430.2×0.4×(2.7+2.9)0.448

KL440.2×0.4×(3+3)0.480

KL450.2×0.4×(1.3+2.6)0.312

KL460.4×0.6×(2.9+2.7)0.448

KL470.2×0.4×(2.7+4.4)0.448

WKL10.2×0.4×30.240

WKL20.2×0.4×3.10.248

L10.2×0.3×1.6×20.192

L20.2×0.3×1.55×20.186

L30.2×0.4×(3.6+2.8+2.7)0.728

L40.2×0.3×2.4×30.432

L50.2×0.4×2.4×30.576

L60.2×0.4×10.08

XL10.2×0.4×3.50.280

XL20.2×0.4×3.50.280

阁楼层

m³30.394

KL10.2×0.4×(2.1+3.9+1.2)30.394

KL20.2×0.5×(6+3.9)0.990

KL30.2×0.6×3.9×20.936

KL40.2×0.4×(3.9+0.6)0.360

KL50.2×0.6×3.90.468

KL70.2×0.5×(6.6+3.9)1.050

KL80.2×0.4×3.90.312

KL90.2×0.6×(3.9+0.6)0.540

KL100.2×0.5×60.600

工程量计算表

共29页第21页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KL110.2×0.5×(6+3.9)0.990

KL120.2×0.4×(2.1+3.9+1.2)0.576

KL130.2×0.4×(3+3.1)0.488

KL140.2×0.4×(3+2.7+2.8+3.6)0.968

KL150.2×0.4×(3.4+2.4+3.4)×21.472

KL160.2×0.4×(3.4+2.4+3.4+3.7)1.032

KL170.2×0.4×(3.7+3.4+2.4+3.4)1.032

WKL10.2×0.4×(3.7+3.9)0.608

WKL20.2×0.8×3.9×21.248

WKL30.2×0.4×3.3×20.528

WKL40.2×0.5×60.600

WKL50.2×0.4×3.65×30.876

WKL60.2×0.4×3.650.292

WKL70.2×0.8×5.60.896

WKL80.2×0.6×3.650.438

WKL90.2×0.4×6.60.528

WKL100.2×0.4×2.70.216

WKL110.2×0.5×(3+3.3)0.630

WKL120.2×0.4×3.650.292

WKL130.2×0.4×(3.3+3.9)0.576

WKL140.2×0.4×(10.4+3.1)1.080

WKL150.2×0.4×(10.4+3.1)1.080

WKL160.2×0.4×30.240

WKL170.2×0.4×(3+3.1)0.488

WKL180.2×0.4×30.240

WKL190.2×0.4×2.70.216

WKL200.2×0.4×30.240

WKL210.2×0.4×2.70.216

WKL220.2×0.4×2.10.168

WKL230.2×0.4×2.10.168

WKL240.2×0.4×(2.7+0.6)0.264

工程量计算表

共29页第22页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

WKL250.2×0.4×2.70.216

WKL260.2×0.4×(4.4+2.7)0.568

WKL270.2×0.4×(2.7+2.9)0.448

WKL280.2×0.4×(3+3)0.480

WKL290.2×0.4×(1.3+2.6)0.270

WKL300.2×0.4×(2.9+2.7)0.448

WKL310.2×0.4×(2.7+4.4)0.568

KZL10.2×0.6×5.70.684

KZL20.2×0.4×(3+2.7+2.8+3.6)0.968

L10.2×0.3×1.55×20.186

L20.2×0.4×(2.7+2.8+3.6)0.728

L30.2×0.4×2.4×30.576

L40.2×0.4×(1+1.6)0.208

XL10.2×0.4×3.50.280

XL20.2×0.4×3.50.280

屋顶层

m³12.432

WKL10.2×0.4×3.9×41.248

WKL20.2×0.6×(3.9+1.2)×21.224

WKL30.2×0.6×(3.9+1.2)×21.224

WKL40.2×0.4×3.90.312

WKL50.2×0.6×(3.9+1.2)0.612

WKL60.2×0.6×(3.9+1.2)0.612

WKL70.2×0.4×3.90.312

WKL80.2×0.4×(2.7+2.8+3.6)0.728

WKL90.2×0.4×(2.4+3.4+3.4)×21.472

WKL100.2×0.4×(2.7+2.8+3.6)0.728

WKL110.2×0.4×(3.4+2.4+3.4)0.736

WKL120.2×0.4×(3.4+2.4+3.4)0.736

L10.2×0.4×(3.1+3.2+4)0.824

工程量计算表

共29页第23页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

L20.2×0.4×(2.8+3.8+3.8)×21.664

5过梁m³27.123

车库过

m³0.12×0.2×(1+0.48)

×31+0.12×0.2×(0.65+0.48)×12+0.12×0.2

×(0.8+0.48)×6+0.12×0.2×(0.9+0.48)×4+0

.12×0.2×(1.2+0.48)×2+0.12×0.2×(1.5+0.

48)×5+0.18×0.2×(1.8+0.48)

2.144

一层过

m³0.12×0.2×[(1+0.48)×6+(0.6+0.48)×3+

(1.1+0.48)×3+(1+0.48)×3+(0.7+0.48)

×11+(0.8+0.48)×17+(0.9×0.48)×6+

(1+0.48)

+(1.2+0.48)×2+(1.3+0.48)+(1.5+0.48)×11+

(1.5+0.48)×3]+0.18×0.2×(1.8+0.48)

+0.3×0.2×(2.4+0.6)×5+0.18×0.2×

(1.8+0.48)×3+0.18×0.2×(1.8+0.48)×7

4.171

二~五

层过梁

m³[4.171-0.18×0.2×(1.8+0.48)×3]×415.7

六层过

m³3.925-0.12×0.2×(1.2+0.48)3.885

阁楼层m³0.12×0.2×(1.5+0.48)×3+0.3×0.2×

(2.4+0.6)×6

1.223

6雨棚㎡(0.55+0.05)×(1.5+0.05+0.05)×4×6+

(1.2+0.05+0.05)×0.6×2×6+

(1.8+0.05+0.05)×0.59×1×6+(2.6+0.05)

×0.59×6×6

95.412

7台阶㎡1.8×0.3×31.62

8窗台m³(2.35×0.15×1.85+2.2×0.05×0.11+2.1×0.

05×0.06+1.45×

(0.15×1.85+1.3×0.05×0.1+1.2×0.05×0.0

6+1.6×0.15×1.85+1.45×0.05×0.11+1.35×0

.05×0.06+3.2×0.15×1.85+3.05×0.05×0.11

+2.95×0.05×0.0

59.154

工程量计算表

共29页第24页

序号

分部分项工

程名称

部位与规

单位计算式计算结果

6)×4×3+

(2.35×0.15×1.85+2.2×0.05×0.11+2.1×0.

05×0.06+1.45×0.15×1.85+1.3×0.05×0.1+1

.2×0.05×0.06)×20+

(2.35×0.15×1.85+2.2×0.05×0.11+2.1×0.

05×0.06)×12

五钢筋工程t

1筏板基础Φ12以内773.523×0.024181.448

Φ12以外773.523×0.05643.317

2柱KZ1

Φ12以内20.446×0.051.033

Φ12以外20.446×0.1162.372

KZ2

Φ12以内29.837×0.051.492

Φ12以外29.837×0.1163.461

KZ3

Φ12以内69.969×0.0382.659

Φ12以外69.969×0.0886.157

KZ4

Φ12以内14.767×0.0520.768

Φ12以外14.767×0.1221.802

KZ5

Φ12以内19.891×0.0380.765

Φ12以外19.891×0.0881.750

工程量计算表

共29页第25页

序号

分部分项工

程名称

部位与规

单位计算式计算结果

KZ6

Φ12以内9.185×0.050.459

Φ12以外9.185×0.1161.065

KZ7

Φ12以内56.76×0.052.838

Φ12以外56.76×0.1166.584

KZ8

Φ12以内13.675×0.050.684

Φ12以外13.675×0.1161.586

KZ9

Φ12以内8.402×0.050.420

Φ12以外8.402×0.1160.975

KZ10

Φ12以内11.102×0.050.555

Φ12以外11.102×0.1161.288

KZ11

Φ12以内7.633×0.0520.397

Φ12以外7.633×0.1220.931

KZ12

Φ12以内6.353×0.0520.330

Φ12以外6.353×0.1220.775

KZ13

Φ12以内4.662×0.050.233

Φ12以外4.662×0.1160.541

工程量计算表

共29页第26页

序号

分部分项工

程名称

部位与规

单位计算式计算结果

KZ14

Φ12以内1.201×0.0380.046

Φ12以外1.201×0.0880.106

3梁t

框架梁

Φ12以内269.229×0.04311.577

Φ12以外269.229×0.10026.923

过梁

Φ12以内27.123×0.0320.868

Φ12以外27.123×0.0740.064

4板t

Φ12以内750.717×0.04332.281

Φ12以外750.717×0.10020.79

5雨篷t

Φ12以外9.5412×0.0460.439

6楼

t

Φ12以内26.0064×0.0360.936

Φ12以外26.0064×0.0842.185

六模板工程

1筏板基础㎡773.523×0.52402.232

2柱㎡

KZ120.446×8163.568

工程量计算表

共29页第27页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

KZ229.837×8238.696

KZ369.969×13.33932.687

KZ414.767×5.5682.105

KZ519.891×13.33265.147

KZ69.185×873.48

KZ756.76×8454.08

KZ813.675×8109.4

KZ98.402×867.216

KZ1011.102×888.816

KZ117.633×5.5642.439

KZ126.353×5.5635.323

KZ134.662×837.296

KZ141.201×13.3316.009

3梁㎡

框架梁269.229×8.682336.908

过梁27.123×12325.476

4板㎡750.717×8.076058.286

七屋面工程

1平屋面㎡(6.1×5.5+0.7×3.2+2.6×4.5+4.8×3.9+4.6

×5.5+3.5×4.1+2.3×2.2)

×2+2.9×2.15+5×2.15+15.6×3.75+2.6×2.1+

3.5×3.4+3.6×5.2

332.305

2坡屋面㎡13.2×8.43×2+13.1×8.43332.985

八楼地面工程

1垫层m³[(14.64-0.48-1.5)×

(4+3+4+3.7+4.5×4+6.6×2+3.9+6.6×2+4.25

×3+3.9+3.3+10.5+22.6)-(1.8+2.7+0.12)×0.6

117.081

工程量计算表

共29页第28页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

-1.8×(11+0.12)+(9.4-7)×(8.1-0.12)+3×

(8.1-0,12)+(35.3-0.12)×(6.6-0.12)+

(49.01-0.12)×(7.8-0.12)+(30.94-0.12)

×7.8]×0.1

2找平层㎡4946.845

车库1170.81-0.2×(3.9+3.3+4.5×4+6.6×2+3.9+6.

6×2+4.25×3+6.6×2+3.9+3.3+10.5+22.6)-0.1

×(3.9×3+3.3+2.3×2+4.5×4+4.25×6+3.9+2.

7+6.8_7.2+2.35+4.5×3+7)

1135.255

一~六

[(3.1×3.7+4.15×2.5+3.5×4.35+1.7×1.25+

0.6×2.95+1.05×0.8+3.8×10+2.95×0.6+2.8

×5.9+3.3×4.4+1.55×2.1+3.8×6+3.4×3.1+3

.4×4.4+1.1×1.7)

2963.49

×2+3×1.4+6.7×3.7+9.7×4.3+10.5×1.6+2.1

5×3.4+1.55×6.1+0.6×4.8+6×4+3.4×4.05+1

.1×1.7+4.3×3.5]×6

阁楼层(6.1×5.5+0.7×3.2+2.6×4.5+4.8×3.9+4.6×

5.5+3.5×4.1+2.3×2.2+10.4×5.9)×2+2.9×2

.15+5×2.15+15.6×3.75+2.6×2.1+3.5×3.4+3

.6×5.2+10.3×5.9

515.795

屋面层(6.1×5.5+0.7×3.2+2.6×4.5+4.8×3.9+4.6×

5.5+3.5×4.1+2.3×2.2)×2+2.9×2.15+5×2.1

5+15.6×3.75+2.6×2.1+3.5×3.4+3.6×5.2

332.305

3面层㎡

整体面层4946.845

厨卫地砖面层(1.75×2.5×10+1.7×3.1)×6+

(2.95×2×2+3.3×2×2+3.4×2)×6

484.92

楼梯整体面层2.6×6.6×6×3308.88

4踢脚线m

①整体面层踢脚

线

m

工程量计算表

共29页第29页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

车库56.12-0.24-2.6×2-2.7×3-8×0.2-9×0.1+14.

64-0.24-1.5-4×0.1+0.6+3.5+11.2-4×0.2-3×

0.1+9.3+18.1+41.84+3.9+3.3+4.7×2+2.6+3.8

×2+2.9×4+2.3×3+7.2×2+4.5×14+11×2+4.9

+4.8+3.5×3+10.5+3.3+41.84+34.55×2+4.25×

16+7.2-0.4+6.8-0.5+2.4×2+3.9×3+2.5×2+2.

6×2+3.1×2+2.5×2

544.66

一~六

层踢脚

线

(3.3+3.3+3.6+3.3+3.3-0.5+2.7+2.7+4.5-0.3+

56-15×0.2+2.7+1.2+2.7+4.5-3×0.2+3.1+3.7

×2+4.1×2+2.5×2+5.2+5+3.4×4+4.9×2+1.95

+4.05×2+3.1+3+6.5+4.5+4.3×7+6.9+6.5+1.9+

2093.7

1.3+4.9×2+3.4+4.05×4+3.4+6.1×4+2.5+2.4+

4.3×2+4.9×2+4.3×6+2.5×2+4.1×3+2.5+2.3

)×6

阁楼层

踢脚线

(2.8×2+4.3×2)×2+3.2×2+4.3×243.4

②块材踢脚线m[(3.55+1.04+0.33)

×2+0.1×4+0.32+0.38]×3+[(1.25+1.82+0.33)

×2+0.1×4+2.4+0.32+0.38]×3×5

187.32

5散水㎡(56.24-2.6-3-2.6-2.7-2.6+14.64+56.24+0.9

×2+1.8+1.2+0.6+0.6+14.64)

×0.9+4×0.9×0.9

124.074

6楼梯扶手m(2.34+1.04+0.26×6+1.82×6+1.1)×350.88

九墙柱面工程

1内墙抹灰㎡

车库61.35÷0.2×2+12.618÷0.1×2+67.25÷0.19+9

9.148+286.724-(124+13.95)

1467.729

一层50.476÷0.19+92.395÷0.2×2+9.223÷0.1×2-

234.24-69.485

1070.348

二层92.395÷0.2×2+50.476÷0.19+9.223÷0.1×2-

197.88-73.265

1102.928

三~五

277.185÷0.2×2+151.428÷0.19+27.669÷0.1

×2-593.64-224.115

3304.464

工程量计算表

共页第30页

序号

分部分项工程

名称

部位与

规格

单位计算式计算结果

六层92.395÷0.2×2+50.476÷0.19+9.223÷0.1×2-

198.2-74.205

1101.668

阁楼层[(3.8+2.8+3.8+4.3×6+3.8+2.8+3.8)×2.8-(0

.24×0.21+0.15×0.21+0.24×0.21)]×2+

(3.1+3.2+4)×2+4.3×6-

(0.24+0.21+0.15×0.21+0.24×0.21)

-9.45-30.24

267.273

2外墙抹灰㎡(56.24-2.6-3-2.6-2.7-2.6+14.64+56.24+0.9

×2+1.8+1.2+0.6+0.6+14.64)×16.8-

(73.265+69.485+672.345+74.205+39.69)

1326.578

3SBS防水卷材㎡117.081+

(56-6-0.48×2-0.4×13-0.5+14.4-1.5-0.48×

2-0.7+1.22+11-0.3×2-0.4×2+6.6-0.48-0.4-0

.3)×1.4+

(0.3+7.5-0.3+18.1-0.6×3+38.8-4×0.6-0.3+

7.2-0.3-0.12)×4.3+332.305

835.258

十天棚工程㎡4943.159

车库1135.255

一~六

[(3.1×3.7+1.7×2.5+1.7×1+2.9×3.7+4.1×

2.5+3.8×7+2.7×1.6+1.2×1.6+3.5×4.3+2.8

×4.3+3.8×1.6+6.8×1.6+3.3×6.4+3.1×4.05

+1.55×2+2.2×3.35+3.8×4.3+3.4×6.3)

×2+1.7×3.1+3×7+3.5×3.7+3.4×4.3+3.1×4

.3+3.2×4.3+3.4×4.05+3.4×7+2.95×1.2+4.3

×4+3.5×3.35+3.5×4.3)]×6

3362.43

阁楼层(3.8×4.3+2.8×4.3+3.8×4.3+10.8×1.6)

×2+(3.1×4.3+3.2×4.3+4×4.3+10.7×1.6)

185.41

楼梯地

(2.6-0.2)×(6.6-0.5-0.08)×6×3260.064